Site conditions come first
Caliche, slope, drainage, utility runs and access decide a real share of the cost before a single finish is chosen. Two identical plans on two different lots in the valley are not the same number.
Planning & cost
How the number gets built, and what we need from you before we can give you one you can hold us to.
The honest answer
Anyone who quotes you a per-square-foot number without seeing the lot is guessing. Here is what we look at instead.
Caliche, slope, drainage, utility runs and access decide a real share of the cost before a single finish is chosen. Two identical plans on two different lots in the valley are not the same number.
We price a written list of work with an allowance against each selection you have not made yet — cabinets, stone, tile, fixtures, appliances. An allowance without a number behind it is how budgets get lost.
Structure and enclosure — foundation, framing, roofing, stucco, windows, insulation, mechanical, electrical and plumbing — take the largest share of most builds. Finish level moves the rest, sometimes by a wide margin.
Anything added mid-job is priced and approved in writing before the work happens, so the change does not silently reprice the whole project at the end.
What to bring
Address and parcel number, and any survey, plat or HOA documents you have. Septic and well records if the property is outside city service.
Drawings, a sketch on paper, or the same house in the neighborhood you keep photographing. All of it helps.
Who uses the space, what annoys you now, whether you cook, work from home, or need a door that closes.
Even a range. Knowing whether the ceiling is a kitchen refresh or a structural rebuild decides the whole conversation.
Is there a move-out date, a family event, a lease ending, or a tenant moving in? Hard dates change sequencing.
Fixtures, floors, cabinets and trim you intend to keep — replacing them quietly adds cost.
Financing and paperwork
Payments are tied to completed stages of work, written into the contract — not a large deposit up front.
For a construction loan or refinance, we provide the scope, schedule, draw requests and lien waivers your lender asks for.
Anything added mid-job is priced and signed before it is built, so the change does not reprice the project at the end.
The scope says so explicitly — permits, allowances, owner-supplied fixtures and anything outside the listed work.
Cost questions
It depends on scope, site conditions and finish level, and honest ranges move every year with material pricing. We will not give you a per-square-foot number over the phone — we walk the project, write a scope with visible allowances, and price that. See the planning page for how the number is put together.
Both. Whole-home remodels, kitchens, baths, additions and casitas are a large part of what we build, including older adobe and Territorial homes in and around Mesilla.
A kitchen or bath is measured in weeks, a whole-home remodel in months, and a ground-up home is long enough that the schedule should be in writing before you commit. We give you the sequence and the milestones, not a promise of a single date.
Yes. Drawings, stamped engineering where the work needs it, permit submission through the city or county, and inspections are part of the job.
Sometimes — it is worked out in the scope. Where you supply, we note who warranties what and what happens to the schedule if a delivery runs late.
Ask, and it comes to you in writing: the New Mexico contractor's license number, the certificate of general liability and workers' compensation coverage, and the bond letter for any project that needs one. Nothing about licensure, coverage limits or bonding is printed on this website until the current certificate is in hand.
The core service area is Las Cruces and Southern New Mexico. Work further out — El Paso, Alamogordo, the lake — is taken case by case depending on scope and schedule.
Draws tied to completed stages of work, spelled out in the contract, with lien waivers from subcontractors as those stages close.
We'll walk the property, then put the scope and allowances in writing.